IAG Multi-level Fitout & Structural Refurbishment - Perth

WA
Project Information
  • Value
  • Floor Area

    4,100m2

  • Delivery Method
    CM & ECI
  • Architect
    Futurespace
  • Project Type
    Refurbishment
    Fitout
  • Sector
    Commercial
  • Location
    WA
  • Project Manager
    Acuity Project Management

The IAG Perth project involved delivery of a premium interior design concept alongside major structural refurbishments. Spanning across 3 levels, each newly fitted floor required an interconnecting stairwell to be cut in and constructed at each east and west wing. Under a live environment and highly secured setting, this project saw several challenges met and successfully managed by our team.

The project achieved practical completion and remained true to budget. Our team worked closely with the client and superintendent to deliver:

  • Feasibility and investigation works through an ECI model
  • Design, scoping and procurement
  • Peer review and a streamlined approvals process.

The project also took part in the GreenChair environmental initiative, a program designed to reduce construction waste and carbon emissions from building activity. In collaboration with GreenChair and IAG, Renascent were able to achieve a 55% reuse rate on building waste such as furniture, whitegoods and electronics, saving 16,296kg from being deposited in to landfill.

No items found.

See More Projects

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
TALK TO US
Need a team you can trust for your next project?
Reach out to Renascent.